Project
Information Memorandum (for Lenders / Investors)
|
- Project Details; location; details
of promoters, infrastructure facilities, availability of
water, etc.
- Details of technical specifications,
fuel specifications, environmental considerations, etc.
- Estimate Project Cost, Means
of Finance, Financial Analysis, etc.
- Assessment of Project Risks such
as political risks, exchange risks, fuel price variability,
performance risk, etc.
- Vicinity maps, plant layout,
project milestone chart
- Details and status of project
permits and clearances
|
|
|
Project
Profile (for Due Diligence Review & Assessment)
|
- Location
& Access to Site; Site Meteorological Data, Site Survey,
Soil Investigation
- Power Evacuation System; Switchyard,
Transmission & Interconnection
- Fuel Supply; Transportation &
Delivery Related Issues, Site Storage Issues, Secondary
Fuel Related Issues, Fuel Supply Agreement
- Water, Sources and Water System
- Environmental; Site Features
and Emissions
- Power Plant Features; Layout,
Generating Equipment, Electrical Equipment, Controls &
Instrumentation System, Civil Works
- Project Permits and Clearances;
Review, Verification and Validation
- Other Project Activities; Assessment
of Investment Costs, Verification/Support of Financial Model
Inputs, Power Purchase Agreement, Project Milestone Schedules
|
 |
|
Detailed
Project/Feasibility Report
|
- Demand Analysis and justification
of the project
- Basic requirements such as land,
fuel, water, infrastructure
- Site selection after examining
the alternative sites for the plant
- Fuel linkage and facilities for
receiving, storage, and handling of fuel
- Property/plot plan and also preliminary
equipment layout of main plant showing major equipment,
handling facilities and service corridors
- Technical description and brief
specification of all major equipment and systems
- Civil and structural engineering
aspects
- Environmental considerations
and adoption of suitable measures as required
- Manpower planning and organizational
set-up
- Project implementation schedule
showing key milestone activities and monitoring of activities
- Estimation of project cost and
broad break-up under major heads and phased expenditure
over period of project execution
- Computation of cost of generation
at power plant bus based on mode of financing as indicated
by Client
- Submission of draft report, discussion
with Client on same and updating report for final submission
- Assistance in furnishing replies
to question(s) and providing any
additional information as may be required for approval of
the project
|
|
Site
Survey Report
|
- To study suitability of site
for construction of project including future expansion,
if any
- Accessibility to site by rail
or road
- Assess availability and quality
of water for meeting construction and maintenance requirements
of the project
- To record the relevant ground
features such as existing structures, roads, canals, etc.
and prepare a site
- Plan based on contours and to
record general topography of site showing tanks, mounds,
vegetable cover, etc.
- To study drainage characteristics
of land including presence of water table, etc.
|
|
Soil
Investigation Report
|
- Mobilization and de-mobilization
of boring equipment including transportation to site, work
and erection over approved locations
- Drilling in all types of soil
including clay, sand, peat, etc. and drilling in soft or
weathered rock including hard or sheet rock if need be
- Conducting Standard Penetration
Tests (SPT) at intervals of 2 meters to assess characteristics
of soil and recovering disturbed samples from split spoons
at intervals of 3 meters
- Recovering undisturbed samples
at regular intervals, if required
- Conducting laboratory tests on
soil samples thus obtained and conducting Plate Load Tests
- Preparation of Soil Investigation
Report
|
|